Eirene Construction Summer 2007

Please excuse me as this is my first attempt to post any pictures to a blog. I wanted to share some pictures with you from the construction done this summer to encourage you as to how things are progressing.

Entrance in May

Entrance in May

Entrance in September

Entrance in September

Place for trash enclosure in May

Place for trash enclosure in May

Trash enclosure in September

Trash enclosure in September

Medical clinics in May

Medical clinics in May

Medical clinics in September

Medical clinics in September

Place for tool room in May

Place for tool room in May

Tool room in September Tool room inside (September)

Tool room (outside and in) in September

Play area for school kids in May

Play area for school kids in May

Play area for school kids in September

Play area for school kids in September

Old Classroom in May Old ceiling in May

Old Classroom/Old Ceiling in May

New Classroom in September New Ceiling in September

New Classroom/New Ceiling in September

Hallway in May

Hallway in May

Hallway in September

Hallway in September

Area by tool room in May

Area by tool room in May

Area by tool room in September

Area by tool room in September

A special “Thank You” to all of the teams that came down this summer and served with us to make these changes possible.

Leave a Reply