Eirene Construction Summer 2007
Monday, September 24th, 2007Please excuse me as this is my first attempt to post any pictures to a blog. I wanted to share some pictures with you from the construction done this summer to encourage you as to how things are progressing.
Entrance in May
Entrance in September
Place for trash enclosure in May
Trash enclosure in September
Medical clinics in May
Medical clinics in September
Place for tool room in May
Tool room (outside and in) in September
Play area for school kids in May
Play area for school kids in September
Old Classroom/Old Ceiling in May
New Classroom/New Ceiling in September
Hallway in May
Hallway in September
Area by tool room in May
Area by tool room in September
A special “Thank You” to all of the teams that came down this summer and served with us to make these changes possible.